Welcome!  ( Login - Member )
 
Online
There are currently, guest(s) and member(s) that are online.

You are Anonymous user. You can register for free by clicking here

Login
Nickname

Password

Don't have an account yet? You can create one. As a registered user you have some advantages like theme manager, comments configuration and post comments with your name.

Last News

Welcome to Dr. Ebrahimnejad’s web page


 
Isfahan- Shiraz railway - 4 Bridges
 

Isfahan- Shiraz Railway project includes 4 main viaducts  located at

KM: 275, KM: 318, KM: 331 and KM: 353


KM: 275

Total Length: 276 m

Main Span: 6 x 46 m

Width: 5.6 m

Structural System: Concrete arch


KM: 318

 Total Length: 100 m

Spans: 5 x 20 m

Skew: 30 degree 


KM: 331

 Total Length: 40 m

Spans: 2 x 20 m

Skew:  45 Degree


KM: 353

 Total Length: 100 m

Spans: 5 x 20 m

Skew: 0 Degree

 


 

   Structural System: Precast I Shaped Concrete Girders and Concrete Slabs with Closed Abutments


Client: Ministry of Roads and Transportation

   Consultant: Haraz Rah Consulting Engineers

Contractor: Stratus Co

Design: 2002

Construction: 2007

 


 





visite: 896
Menu

Last Projects





















Home |  Search |  Download |  Archive |  Contact Us